On 18 May 2022, the EU General Court (the “GC”) upheld the European Commission’s (the “EC”) €28 million fine imposed on Canon for gun-jumping in the context of a (somewhat unique) so-called warehousing structure. The judgment confirms that structures such as the one at issue are not allowed under EU law without an express derogation from the EC.

 

Key points of the judgment

  • The GC confirms that the warehousing structure put in place by Canon breached its obligation not to implement its acquisition of Toshiba Medical Systems Corporation (“TMSC”) before the EC cleared the transaction (and the obligation to notify the deal prior to implementation).
  • The GC ruled that a breach of the standstill obligation does not require control to be acquired in full or in part. By placing TMSC into a warehousing structure, Canon had partially implemented the acquisition, as this structure contributed to a lasting change of control in the target.

 

Background

In 2016, Canon Inc. acquired TMSC. The acquisition was carried out through a holding (or a warehousing) structure in two steps:

  • In March 2016, MS Holding (an SPV created for the purposes of the transaction) acquired from Toshiba 95 percent of TMSC’s shares for a consideration EUR 800. Simultaneously, Canon and Toshiba concluded another agreement, under which Canon acquired the remaining 5 percent of the shares and a call option for TMSC shares held by the SPV for a consideration of EUR 5.28 billion (both transactions, the “Interim Transaction”). The two transactions were implemented immediately.
  • In December 2016, after having secured all the merger control clearances, Canon exercised its call option and TMSC became a wholly owned subsidiary of Canon (the “Ultimate Transaction”).

Canon started the pre-notification to the EC of its proposed acquisition of sole control over TMSC in March 2016 and notified the transaction in August 2016. Subsequently, the EC unconditionally cleared the transaction in September 2016.

Also in March 2016, an anonymous complainant approached the EC and by July 2016, the EC informed Canon that it was conducting an investigation for possible violations of the standstill obligation and the notification requirement. In July 2017, the EC issued the statement of objections and in June 2019, the EC adopted a final decision imposing two fines on Canon for failing to notify a concentration and for implementing a concentration before its clearance.[1] The EC considered, first, that the Interim Transaction and the Ultimate Transaction constituted a single concentration; second, that the Interim Transaction was a necessary step to achieve a change of control; and third, that Canon partially implemented the concentration by carrying out the Interim Transaction. It thus fined Canon EUR 28 million for a breach of the standstill obligation and for failure to notify the transaction before its implementation, in violation of Articles 7(1) and 4(1) of the EU Merger Regulation.

Competition authorities in the US, China and Japan reached similar conclusions.

In the EU, this case follows the EY judgment of the Court of Justice,[2] in which the Court ruled that the standstill obligation is breached where the parties implement operations contributing to a lasting change in the control of the target undertaking. In EY, the Court ruled that the implementation of steps which are not necessary to achieve a change of control of an undertaking concerned by that concentration do not breach the standstill obligation. On that basis, the Court found that the termination of a cooperation agreement, which was a condition precedent to the merger, did not constitute partial implementation given that it had no direct functional link with the change of control.

A key question in the Canon case was whether the Interim Transaction could constitute partial implementation despite the fact that it did not lead to an acquisition of control over the target. Another question was whether the Interim Transaction and the Ultimate Transaction should be viewed as one single transaction and, consequently, that the implementation of the Interim Transaction could be viewed as a breach of the standstill obligation. The GC answered both questions in the affirmative.

 

GC’s judgment

Canon claimed that the implementation of intermediary steps not leading to a change of control over the target could not constitute a breach of the standstill obligation. Since the Interim Transaction did not confer to Canon control over TMSC, it could not constitute a partial implementation in breach of the Merger Regulation. 

The GC rejected that argument and, in line with EY, confirmed that the implementation of a concentration is not limited to the acquisition of control, but can also cover any operations which contribute to a lasting change of control of the target.

Thus, the key question in the case was not whether there was an acquisition of control of TMSC prior to the clearance by the EC, but whether the Interim Transaction contributed, in whole or in part, in fact or in law, to the change of control of that undertaking before that date.

In this regard, the GC confirmed the EC finding that the Interim Transaction and the Ultimate Transaction constituted a single concentration. In particular, the GC confirmed that the Interim Transaction was a necessary step in the implementation of the overall transaction and had a direct functional link with the change of control over TMSC. The Court found that, without the two-step transaction structure proposed by Canon, Toshiba would have been unable to relinquish control of TMSC and irreversibly collect payment from Canon. The GC also noted that Canon had acquired the possibility of exercising a certain degree of influence over TMSC as a result of the Interim Transaction (albeit that influence was insufficient already to confer control upon Canon), since, from the date of the Interim Transaction, and irrespective of the outcome of merger clearance, Canon had sole power to determine the identity of the ultimate purchaser of TMSC.[3]

 

Analysis and implications 

This case marks another victory for the EC, which has seen all its recent gun-jumping decisions and steep fines imposed in them upheld by the GC, including Altice[4] and Marine Harvest.[5] More generally, the case follows the recent trend of increased enforcement against gun-jumping, as the below statistics show.

Source: LexisPSL’s infringement database in its competition module.

More fundamentally, the case is important because it confirms that the notion of partial implementation can include steps which do not necessarily involve, in themselves, a change of control over the target, and thus do not imply the premature exercise of control prior to receiving EU clearance.

In this respect, the case is different from other cases such as Altice,[6] in which the infringement was based on both the ability of the acquirer to exercise decisive influence over the target (from the SPA interim covenants) and the actual exercise of that influence (due to the pre-closing information exchanges). In Altice, the EC found concrete examples of Altice’s interfering in PT Portugal’s day-to-day operations prior to EC clearance.

In the same vein, the recent decision from the French competition authority in COFEPP[7] sanctioned the company EUR 7 million for the progressive takeover of the target, through gradually increasing its equity stake over the years leading to a de facto control, prior to clearance.

It is clear from both of these cases that the breach of the standstill obligation was due to the premature exercise of control. This was, in itself, liable to defeat the purpose of the EU Merger Regulation, which is to ensure that the EC can control the effect of a concentration before the change of control takes place.

The current case shows that the prohibition, in the GC’s view, extends beyond that, and covers any step or operation contributing to a lasting change of control. Accordingly, certain steps are caught by the prohibition, if they have a “direct functional link” to the implementation of the transaction. This is regardless of whether such steps give the acquirer the possibility to exercise control prematurely. It is clear that Canon did not exercise any control over TMSC prior to obtaining merger control clearance from the EC. At most, it could only have influenced the identity of an alternative acquirer, in case the authorities had opposed the transaction. Treating such a situation in the same manner as a premature exercise of control seems far-reaching.

Given the peculiarities of the Interim Transaction in this case, it remains to be seen if the Canon case seals the fate of any warehousing scheme whereby a target is transferred to an interim buyer that has a back-to-back arrangement with the final acquirer. Notably, in this case, the interim buyer was not a fully independent bank or third party, but rather an SPV established by the parties for the purposes of this transaction. In addition, as noted by the GC, in case the EC had not cleared the transaction, Canon was in a position to decide to whom TMSC would be sold instead. That said, the case generally echoes the negative stance taken by the EC about warehousing schemes in the Consolidated Jurisdictional Notice[8] (“CJN,” paragraph 35); namely, that the standstill obligation applies also to the warehousing of the target with a third party, which is considered as a single transaction together with the ultimate transaction. Such a strict position is unfortunate, given that a warehousing structure can in some cases facilitate the execution of a transaction and be structured in such a way as to entirely preclude any premature influence of the buyer on the target and involve an interim buyer that is fully independent from the parties, thus respecting the spirit of the standstill obligation. Interestingly, in Canon v. Commission, Canon challenged the legality of paragraph 35 CJN, but the GC rejected the argument as ineffective, given that the EC decision was not based on paragraph 35.

It remains to be seen whether Canon will appeal the case to the ECJ.

 

____________________

[1]     Articles 4(1) and 7(1) of the Regulation No. 139 / 2004 of 20 January 2004 on the control of concentrations between undertakings (“EUMR”).

[2]     Judgment of the Court of 31 May 2018, Ernst & Young, C-633/16.

[3]     Judgment of the General Court of 18 May 2022, Canon, T-609/19, para. 223.

[4]     Judgment of the General Court of 22 September 2021, Altice, T-425/18.

[5]     Judgment of the General Court of 26 October 2017, Marine Harvest, T-704/14. Upheld by the ECJ in judgment of 4 March 2020, Marine Harvest, C‑10/18 P.

[6]     Judgment of the General Court of 22 September 2021, Altice, T-425/18.

[7]     Decision of the French Competition Authority of 12 April 2022, Cofepp, 22-D-10.

[8]     Commission Consolidated Jurisdictional Notice under Council Regulation (EC) No 139/2004 on the control of concentrations between undertakings.


________________________

To make sure you do not miss out on regular updates from the Kluwer Competition Law Blog, please subscribe here.


Kluwer Competition Law

The 2022 Future Ready Lawyer survey showed that 79% of lawyers are coping with increased volume & complexity of information. Kluwer Competition Law enables you to make more informed decisions, more quickly from every preferred location. Are you, as a competition lawyer, ready for the future?

Learn how Kluwer Competition Law can support you.

Kluwer Competition Law
This page as PDF

Leave a Reply

Your email address will not be published. Required fields are marked *